Persian
Albanian
Arabic
Armenian
Azerbaijani
Belarusian
Bengali
Bosnian
Catalan
Czech
Danish
Deutsch
Dutch
English
Estonian
Finnish
Français
Greek
Haitian Creole
Hebrew
Hindi
Hungarian
Icelandic
Indonesian
Irish
Italian
Japanese
Korean
Latvian
Lithuanian
Macedonian
Mongolian
Norwegian
Persian
Polish
Portuguese
Romanian
Russian
Serbian
Slovak
Slovenian
Spanish
Swahili
Swedish
Turkish
Ukrainian
Vietnamese
Български
中文(简体)
中文(繁體)
Journal of Prosthetic Dentistry 2006-Apr

Load-fatigue performance of gold crowns luted with resin cements.

فقط کاربران ثبت نام شده می توانند مقالات را ترجمه کنند
ورود به سیستم / ثبت نام
پیوند در کلیپ بورد ذخیره می شود
Joanne Ngo Uy
Jennifer Neo Chiew Lian
Jack Ivan Nicholls
Keson Beng-Choon Tan

کلید واژه ها

خلاصه

BACKGROUND

Resin cements have gained popularity over the past few years because of their improved physical properties. There is a need to test these cements under fatigue loading, as there is growing recognition that fatigue testing is more clinically relevant than traditional monotonic static tests.

OBJECTIVE

This study investigated the load-fatigue performance of complete gold crowns cemented with 4 types of resin cement.

METHODS

Four resin cements (C & B Opaque [CBO], Calibra Esthetic [CE], RelyX Unicem [RU], and Panavia F [PF]) and a control, zinc phosphate cement (HY-Bond [HBZPC]) were tested. Fifty human maxillary premolars were prepared to an occluso-cervical dimension of 4 mm and a convergence angle of 20 degrees. Complete gold crowns were cast (Strator 3) and cemented with 1 of the 5 cements (n=10). A fatigue load of 73.5 N was applied at an angle of 135 degrees to the long axis of each tooth-crown specimen. Preliminary failure was defined as the propagation of a crack in or around the crown luting cement layer. The number of cycles to preliminary failure and the cement failure location were determined. Significant differences in cycles to preliminary failure were assessed by the nonparametric Kruskal-Wallis test, with follow-up Mann-Whitney tests (alpha=.05).

RESULTS

Group CE had the highest rank of cycles to preliminary failure, while HBZPC had the lowest cycles to preliminary failure. Group CE had a significantly higher failure cycle count compared to PF (P=.016), RU (P=.001), and HBZPC (P<.001), but was not significantly different from CBO (P=.112). There was no significant difference in the failure cycle count between RU and HBZPC (P=.070).

CONCLUSIONS

Not all tested resin cements had a superior fatigue life when compared with zinc phosphate cement. Of the 4 resin cement groups, Groups CE, CBO, and PF were significantly superior to HBZPC.

به صفحه فیس بوک ما بپیوندید

کاملترین پایگاه داده گیاهان دارویی با پشتیبانی علمی

  • به 55 زبان کار می کند
  • درمان های گیاهی با پشتوانه علم
  • شناسایی گیاهان توسط تصویر
  • نقشه GPS تعاملی - گیاهان را در مکان نشان دهید (به زودی)
  • انتشارات علمی مربوط به جستجوی خود را بخوانید
  • گیاهان دارویی را با توجه به اثرات آنها جستجو کنید
  • علایق خود را سازماندهی کنید و با تحقیقات اخبار ، آزمایشات بالینی و حق ثبت اختراع در جریان باشید

علامت یا بیماری را تایپ کنید و در مورد گیاهانی که ممکن است به شما کمک کنند ، بخوانید ، یک گیاه تایپ کنید و بیماری ها و علائمی را که در برابر آن استفاده می شود ، ببینید.
* کلیه اطلاعات براساس تحقیقات علمی منتشر شده است

Google Play badgeApp Store badge